PROJECT:

380m3/d Reverse Osmosis Leachate Treatment Plant.

MTL ROLE:

In order to reduce environmental impact, ESL invested in a Leachate Treatment Plant at their Hampton Downs landfill site. MTL provided engineering and contract management services for this new facility, which utilises the latest Reverse Osmosis (RO) technology. This technology helps combat the high rates of fouling, that would normally render RO plants useless in this application, and the design allows ESL to recover the water content from within the leachate.

The specialist equipment required a considerable amount of ‘balance of plant’ which had to be delivered within a tight budget. MTL supported ESL with engineering design, project delivery strategy, preparation and administration of NEC3 construction contracts, preparation of specifications (civil, mechanical and electrical) for a design+build contract, coordination and interfacing management, witnessing of offshore factory acceptance testing, construction monitoring and commissioning management.

PROJECT PARTNERS:

New Logic Research (California)
McMahon Electrical