PROJECT:
Ardmore Water Treatment Plant Activated Carbon Dosing System Replacement.
MTL ROLE:
MTL provided fast track design and contract management services for the replacement of Watercare’s Activated Carbon Dosing facility. Design services included overall Mechanical & Electrical (MECL Ltd) design, Civil/Structural design and ancillary / services design. The works were split into three packages to best meet the accelerated delivery programme and specialist process requirements.
PROJECT OUTCOME:
The new PAC dosing facility is designed to exceed HSNO Regulation and Hazardous Area Zone electrical requirements for storage and handling of combustible dust. MTL designed the building to be constructed over the operational plant which enabled the new facility to be available for dosing <6 months from H2O’s contract award while maintaining PAC dosing capability.
PROJECT PARTNERS:
McMahon Electrical, H2O Engineering, DMCS, Cassidy Construction.