Project:

Connection of a wellhead into the existing wellhead manifold.

MTL Role:

MTL carried out the detailed design of the wellhead piping including the civil and structural design of the pipe supports and foundations.

The design connected the well via a DN300 line to the existing cross over piping between production systems. Our scope included design of the secondary systems such as drains, bypasses and pressure relief.

Project Outcome:

The project was completed in June 2013.